PROJECT SPOTLIGHT: McClure’s Bog Preserve Project

McClure’s Bog, a candidate for inclusion in the Mountain Bogs National Wildlife Refuge, is a French Broad River Valley Bog subtype and host to a suite of unique plant species and wildlife habitat and characterized by low nutrient groundwater-driven hydrology. Similar areas once existed in an extensive patchwork throughout the upper French Broad River Valley bottoms. Land use conversion practices, as well as changes to fire and other natural disturbance regimes, have severely impacted these features and in many cases eliminated them from the landscape. McClures Bog is one of several remnant areas with sustained populations of the unique species representative of this bog subtype. In recognition of this, McClures Bog was purchased for protection years ago, along with an adjacent natural stream corridor, by The Nature Conservancy (Conservancy) and the Natural Heritage Program of North Carolina (NC NHP). The bog has been, and continues to be, extensively managed by The Conservancy to preserve, and improve the sustainability of the species and habitats present.

 

The restoration project was constructed in the winter of 2019-2020 by South Core Environmental with oversight by Wildlands. The tiered wetland basins treat more than 1.5” of rainfall from the watershed, reduce surface runoff and nutrient and other pollutants to the bog, increase infiltration and create a more natural hydrologic regime and route high flows around sensitive areas of the bog. The site was treated for non-native invasive species prior to construction and planted post-construction with a robust and diverse suite of herbaceous, shrub and tree species to mimic other similar natural landscapes in the area. Post-project hydrologic monitoring and thermal groundwater investigation by University of North Carolina at Asheville (UNCA) has verified that the project successfully reduced stormwater inflows to sensitive plant areas and eliminated surface water runoff during most rainfall events.

 

The project was funded by the National Fish and Wildlife Foundation. The Conservancy and Wildlands lead a robust design and stakeholder team and process to execute the project. This team included Peak Hydrogeologic (groundwater testing), Joe Pye Ecological Consulting & Nursery (native plant and habitat restoration), KD Ecological (invasives plant management), US Fish & Wildlife Service, NC NHP, the US Army Corps of Engineers, NC Division of Environmental Quality (DEQ), Henderson County, Conserving Carolina, RiverLink, and UNCA Professor Jeff Wilcox and his students. Wildlands was the project manager and design-build lead, completing gage analysis, hydrologic and hydraulic modeling, visualization graphics and stakeholder coordination, stormwater design, permitting and adaptive management components and assisting with planting plans, invasive species removal scoping, and grant reporting.

 

Plant photos were taken by Emily Israel, Stewardship Coordinator for Wildlands, who was involved in invasive species management at McClure’s Bog under a prior engagement. Emily is dedicated to protecting North Carolina’s natural resources and land stewardship by contributing invaluable work to the conservation sector.

 

PROJECT SPOTLIGHT: Carolina Crossroads Permittee-Responsible Mitigation Project

Located in the heart of South Carolina, the Carolina Crossroads I-20/26/126 Corridor Improvement Project (a.k.a., Malfunction Junction makeover) is the number one interstate improvement priority for the state of South Carolina (https://lnkd.in/euFJQc2). Construction of the Carolina Crossroads project requires unavoidable impacts to waters (of the U.S.) under the jurisdiction of the U.S. Army Corps of Engineers as regulated by Section 404 of the Clean Water Act. The South Carolina Department of Transportation (SCDOT) evaluated multiple mitigation alternatives to offset aquatic resource impacts. The mitigation option that SCDOT selected has offset impacts through the restoration, enhancement, and protection of more than 80,000 linear feet of stream and the protection of more than 8.6-acres of wetlands. This large-scale and unique mitigation project will also protect more than 2,600 acres of land adjacent to the South Carolina Department of Natural Resources’ Belfast Wildlife Management Area, providing future public use and wildlife management benefits.

 

Wildlands led site identification and acquisition, mitigation plan development, natural channel design, generation of construction documents, and construction oversight of the restoration and enhancement activities. Due to the size of the mitigation project and this project serving as the largest stream mitigation project undertaken by the SCDOT, mitigation development was a collaborative effort among multiple project partners including SCDOT, HDR, Open Space Institute, Wildlands and members of the regulatory community. The size of the project site, and availability of on-site resources, allowed Wildlands to critically evaluate on-site materials and maximize the beneficial re-use of native and natural materials during construction. This practice reduced the client’s cost by reducing material import, maintained native characteristics through the reuse of available materials, and facilitated the primary objective of natural channel design. During construction, Wildlands utilized ArcGIS Online to communicate project status with key stakeholders. The contractor completed construction activities at the mitigation site in early 2022 and Phases 1 and 2 of the Malfunction Junction makeover are underway. Wildlands is currently providing post-construction monitoring services.

 

Construction is complete on Owl’s Den Stream and Wetland Mitigation Project

Wildlands is developing this full-delivery project in Lincoln County, which flows on the site of a blackberry farm. The project will provide 2,400 SMUs and 8.0 WMUs for the NC Division of Mitigation Services. Construction was completed in July 2015 and the site will be planted in the fall of 2015.

This full-delivery project included existing site assessment, conservation easement acquisition, permitting, stream restoration design, construction, and seven years of post-construction monitoring of geomorphic stability and vegetation. Detailed hydrologic modeling was completed to study wetland-groundwater connections. The project is currently in the baseline monitoring phase.

 