Wildlands’ Raleigh office gives back to the community

Our Raleigh team had a great time volunteering with Habitat for Humanity of Wake County. During their day of service, they focused on the roof and siding. Through our One + One Initiative, Wildlands gives multiple volunteer hours a year to each the local community. Learn more about our One + One Initiative »

Congrats to Greg Turner for receiving his PE license!

Greg TurnerWildlands is thrilled to announce that Greg Turner has received his professional engineer license! Join us in congratulating Greg on this impressive achievement.

 

Greg serves as a Water Resources Engineer in the Wildlands Engineering Raleigh office. He has more than four years of experience working on a variety of projects including stormwater BMP design, hydrologic and hydraulic modeling, stream and wetland restoration design and monitoring, erosion and sediment control, and wetland delineations. Greg is a team player and enjoys assisting with the planning, design, and monitoring of ecological engineering projects.

Wildlands is excited to sponsor “Partners for Parks”

What a wonderful evening we had at the “Partners For Parks” social event for annual sponsors, last night. Wildlands Engineering is honored to sponsor such a great organization that values the importance of green spaces within our region.

Learn more about Partners for Parks by visiting their website: www.partnersforparks.org.

 

partners-for-parks

 

Wildlands completes the Morgan Creek Stream Restoration Project

The Wildlands team recently completed the Morgan Creek Stream Restoration Project, which will reduce sediment loading and thermal impacts to the Valley River. Wildlands provided assessment, design, bidding, and construction services for this project that is approximately 1000 feet in length.

morgan creek stream restorationREAD MORE

Construction is complete on Owl’s Den Stream and Wetland Mitigation Project

Wildlands is developing this full-delivery project in Lincoln County, which flows on the site of a blackberry farm. The project will provide 2,400 SMUs and 8.0 WMUs for the NC Division of Mitigation Services. Construction was completed in July 2015 and the site will be planted in the fall of 2015.

This full-delivery project included existing site assessment, conservation easement acquisition, permitting, stream restoration design, construction, and seven years of post-construction monitoring of geomorphic stability and vegetation. Detailed hydrologic modeling was completed to study wetland-groundwater connections. The project is currently in the baseline monitoring phase.

 

DCIM100MEDIA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA

Wildlands Engineering Acquires Confluence Engineering

Wildlands Engineering, Inc is pleased to announce their recent merger with Confluence Engineering, PC, an Asheville-based company that specializes in ecosystem restoration, stormwater, and floodplain management. Wildlands Engineering will be the surviving entity in the merger.

Merging with Confluence Engineering is a natural fit for us. Wildlands and Confluence have very similar approaches and guiding principles for ecological restoration and our cultures match exceptionally well. - Shawn Wilkerson, President of Wildlands Engineering

 

Click here to read the full press release »

Wildlands Engineering, Confluence Engineering